Home Quizzes Quiz Detail
Practice Quiz

Benning National Guard WTU Air Assault Phase 1 Practice Test

10 questions 5.0 rating Mobile friendly
$69.00

Unlock the full practice quiz

Get complete access to the questions, explanations and printable quiz resources.

Full access: unlock all quiz questions and explanations.
Printable review: access the full quiz PDF with correct answers after purchase.

About this Exam

Prepare with the Benning National Guard WTU Air Assault Phase 1 Practice Test practice quiz. This question bank includes 10 questions covering uh-60, planning, chain, command, and landing. Use it to review important concepts, identify knowledge gaps, and build confidence for the related exam, course, or assessment.

Sample Questions

Question 1
Which of the following is the correct order for establishing a PZ/LZ?
Establish control facilities; Determine length and width of PZ/LZ; Determine area of unusable; Obstacles; Mark and clear TDPs
Establish control facilities; Determine area of unusable; Determine length and width of PZ/LZ; Obstacles; Mark and clear TDPs
Determine length and width of PZ/LZ; Establish control facilities; Determine area of unusable; Obstacles; Mark and clear TDPs
Establish control facilities; Determine length and width of PZ/LZ; Determine area of unusable; Obstacles
Explanation:
When establishing a PZ/LZ the first priority is to set up control facilities so there is reliable command, control, and security for the operation. With communications and leadership in place, you can coordinate air movement, convey clear instructions to aircrews, and protect the area from threats. Once control is established, you determine the length and width of the PZ/LZ to know the usable landing footprint and how much room is available for rotor wash, maneuvering, and approach. This sizing step sets the physical boundaries you must work within. Next you identify the area that is unusable, such as water, ravines, or ground that cannot support landing gear. Knowing what cannot be used prevents wasted attempts and helps focus your planning on viable terrain. After that, you assess obstacles inside the zone—trees, power lines, poles, debris—that could interfere with rotor blades or touchdown. This step informs clearance needs and potential detours. Finally, you mark and clear the touchdown points, or TDPs, so aircraft have precise, known landing points and a physically safe surface to touch down on. This completes the process by translating the map and risk assessment into actionable, safe landing sites.
Question 2
Which of the following is a sling load related mission for UH-60?
Aerial refueling
Sling load
Reconnaissance
Mine clearing
Explanation:
Sling-load operations involve carrying cargo suspended from the helicopter, using a hook and rigging to lift external loads without landing. For the UH-60 Black Hawk, this is a core mission method to move equipment or supplies to locations where a landing zone isn’t available or practical. The option that describes moving cargo beneath the helicopter fits this concept exactly. Aerial refueling, reconnaissance, and mine clearing are different tasks that don’t involve lifting external loads under the helicopter.
Question 3
Which is NOT one of the five steps to control Close Combat Attack (CCA)?
Describe the enemy location and mark it
Issue a general warning to nearby units
Gain communication with pilot
Describe your location on the ground and mark it
Explanation:
When guiding a Close Combat Attack, you follow a focused, stepwise process to orient the pilot to the target and to your position so the engagement is precise and safe. The steps center on identifying and marking the target, locating and marking your own position, and maintaining a clear two-way link with the pilot to transmit exact targeting information and any necessary instructions. Describing the enemy location and marking it gives the pilot a fixed reference for where to engage. Describing your location on the ground and marking it establishes the opposite reference so the pilot can line up the attack with you as the point of reference. Gaining communication with the pilot ensures you can exchange real-time information, receive updates, and adjust as needed during the mission. Those actions form the core sequence for coordinating the attack. Issuing a general warning to nearby units, while prudent for safety and awareness, is not part of the five-step control sequence used to coordinate the aircraft’s attack. It’s a broader safety measure rather than a specific step in directing the close air engagement.
Question 4
In ACL prior configuration, what is a valid combination of litters and ambulatory patients?
6 litters and 1 ambulatory
4 litters and 2 ambulatory
5 litters and 0 ambulatory
7 ambulatory
Explanation:
ACL prior configuration sets a fixed patient load to balance space, weight, and access during transport. In that setup, six litters with one ambulatory is the valid combination because it prioritizes patients who need a litter for care while still reserving a single ambulatory seat for a walking patient or a medic, keeping the cabin balanced and allowing room for medical crew to operate. The other patterns don’t fit this load plan: one pattern uses only ambulatory patients with no litters, which isn’t compatible with the standard distribution; another pattern leaves an ambulatory count or litter count outside the defined balance, and a different pattern exceeds the ambulatory or litter limits of this configuration.
Question 5
During planning, how does the chain of command influence task allocation?
By assigning responsibilities to subordinates
By removing all risk
By eliminating briefing requirements
By delaying tasks until the operation starts
Explanation:
During planning, the chain of command shapes task allocation by establishing clear authority and responsibility so each task is assigned to the right person. This means a leader delegates specific duties to subordinates who have the appropriate rank, skills, and workload, ensuring accountability and a coordinated, unified effort. By doing this, everyone knows who is responsible for what, reducing ambiguity and enabling efficient execution of the plan. This approach isn’t about removing all risk—risk management remains an ongoing part of planning and execution. It also doesn’t eliminate the need for briefings, which are essential for communicating the plan and confirming who handles each task. And delaying tasks until the operation starts would undermine preparation SAMPLEand coordination. Therefore, assigning responsibilities to subordinates is the way the chain of command influences task allocation during planning.

Ready to test your knowledge?

Buy Now to Access

Additional Information

Benning National Guard WTU Air Assault Phase 1 Practice Test

This practice set contains 10 questions from the matching question bank and focuses on uh-60, planning, chain, command, and landing. Work through each question carefully, review the provided solutions, and revisit topics that need more study before your next attempt.

This is an independent study resource intended for practice and review; it is not an official examination or an endorsement by any organization named in the title.

Frequently Asked Questions

This quiz contains a total of 10 practice questions carefully selected to test your knowledge on this subject.
Yes, you will have exactly 0 minutes to complete the exam. A countdown timer will be visible once you start.
Yes, you can retake this practice test as many times as you need. The questions and options may be randomized on subsequent attempts to ensure comprehensive learning.

Reviews

5.0

Based on 0 reviews

Leave a Review

No reviews yet. Be the first to review!